Determining the Prime Cost of Railway Transportation and Identifying Variable Components
This paper set out to provide transportation planners and policymakers with a systematic process through which to estimate costs representative of the area and service in question and to ease their analysis and decision-making procedures. Although the methodology presented herein is not meant to replace the in-depth and detailed feasibility studies or professional railroad planning activities, it can be used as an intermediate tool to allow planners to more easily perform railroad analysis and planning activities, prior to contracting out feasibility studies. Finally, should this research be further developed, it ought to address other categories of railway services, such as intercity and high-speed trains.